You can but the track has to be built for it. Japan has stations that are passed at 320km/h (200mph). You need minimum four tracks (two platforms, two passing) and curves/gradients suitable for the speed, along with noise mitigations as necessary.
If you’re trying to re-use tracks and stations built in the 1800s that’s possibly less feasible.
You can but the track has to be built for it. Japan has stations that are passed at 320km/h (200mph). You need minimum four tracks (two platforms, two passing) and curves/gradients suitable for the speed, along with noise mitigations as necessary.
If you’re trying to re-use tracks and stations built in the 1800s that’s possibly less feasible.